Methanex Corporation (NASDAQ:MEOH) Q2 2024 Earnings Call Transcript

Methanex Corporation (NASDAQ:MEOH) Q2 2024 Earnings Call Transcript July 31, 2024

Operator: Good morning. My name is Aaron, and I will be your conference operator for today. At this time, I would like to welcome everyone to the Methanex Corporation 2024 Second Quarter Results Conference Call. All lines have been placed on mute to prevent any background noise. After the speakers’ remarks, there will be a question-and-answer session. [Operator Instructions] Thank you. I would now like to turn our call over to the Director of Investor Relations at Methanex, Ms. Sarah Herriott. Please go ahead, Ms. Herriott.

Sarah Herriott: Good morning, everyone. Welcome to our second quarter 2024 results conference call. Our 2024 second quarter news release, management’s discussion and analysis, and financial statements can be accessed from the Financial Reports tab of the Investor Relations page on our website at methanex.com. I would like to remind our listeners that our comments and answers to your questions today may contain forward-looking information. This information, by its nature, is subject to risks and uncertainties that may cause the stated outcome to differ materially from the actual outcome. Certain material factors or assumptions were applied in drawing the conclusions or making the forecasts or projections, which are included in the forward-looking information.

Please refer to our second quarter 2024 MD&A and to our 2023 Annual Report for more information. I would also like to caution our listeners that any projections provided today regarding Methanex’s future financial performance are effective as of today’s date. It is our policy not to comment on or update this guidance between quarter. For clarification, any references to revenue, EBITDA, adjusted EBITDA cash flow, adjusted income, or adjusted earnings per share made in today’s remarks reflects our 63.1% economic interest in the Atlas facility, our 50% economic interest in the Egypt facility, and our 60% interest in Waterfront Shipping. In addition, we report adjusted EBITDA and adjusted net income to exclude the mark-to-market impact on share-based compensation and the impact of certain items associated with specific identified events.

These items are non-GAAP measures and ratios that do not have any standardized meaning prescribed by GAAP and therefore unlikely to be comparable to similar measures presented by other companies. We report these non-GAAP measures in this way, because we believe they are a better measure of underlying operating performance and we encourage analysts covering the company to report their estimates in this manner. I would now like to turn the call over to Methanex’s President and CEO, Mr. Rich Sumner, for his comments and a question-and-answer period.

Rich Sumner: Thank you, Sarah; and good morning, everyone. We appreciate you joining us today as we discuss our second quarter 2024 results. Our second quarter average realized price of $352 per ton and produced sales of approximately 1.6 million tons generated adjusted EBITDA of $164 million and adjusted net income of $0.62 per share. Adjusted EBITDA was higher compared to the first quarter of 2024, primarily due to higher average realized price. Our second quarter was negatively impacted by $13 million of G3 delay costs recognized in adjusted EBITDA, which was comprised of costs associated with monthly utilities, take or pay contracts, and employee costs. Excluding the G3 — these G3 costs, adjusted EBITDA would have been $177 million.

The safe restart of G3 continues to be our company’s top priority. During the quarter, the G3 team completed the repair to the auto thermal reformer and implemented conditions to allow us to progress back into startup. I’m very pleased to report that yesterday we reached first methanol production from G3 and we expect the plant to ramp up to full rates in the coming weeks. The safety performance of our team and partners on the G3 project has been outstanding, and I would like to extend my personal thanks to the team for their continued hard work and dedication to completing this project safely. G3 significantly increases our cash flow generation capability and has one of the lowest emission intensity profiles in the industry. Now turning to the second quarter methanol pricing and market dynamics.

Our second quarter global average realized price of $352 per ton was $9 higher than the previous quarter. Through the first part of the quarter, methanol markets tightened with increased demand outpacing supply, leading to a significant global inventory drawdown and increasing methanol prices. Markets remain tight in the Atlantic basin and rebalanced in China in June when demand slowed down with several Methanol-to-Olefins, or MTO, units taking maintenance or lowering operating rates. We believe operating rates from MTO producers are increasingly becoming the balance on the global market as supply struggles to keep pace with demand growth. Overall, global methanol demand was higher compared to the first quarter of 2024. Traditional chemical applications and energy-related demand grew above 3% compared to the prior quarter, driven by increased economic activity globally, seasonally high construction and transportation activities, and favorable energy pricing, which continues to support methanol demand into energy applications.

An aerial view of a petrochemical manufacturing plant, its intricate network of pipes and vats reflecting the industry's innovation and complexity.

MTO demand decreased in the quarter, as plant took — as plants took outages or lowered operating rates in line with methanol supply constraints and increasing methanol prices. MTO operating rates decreased from around 85% in the first quarter to operating rates between 50% and 60% through June and into July with various improvements in methanol supply through the quarter. We’ve recently seen one large MTO unit restart, but three large scale units are currently idle, representing approximately 4 million tons to 5 million tons of annual demand. On the supply side, we saw various planned and unplanned outages and feedstock constraints restricting supply availability in the second quarter. This limited supply from various regions globally and in particular, methanol production from Iran was slower to enter the market after seasonal gas restrictions.

As a result, global inventory levels were under meaningful pressure, reaching 18-month lows. Low levels in China and increasing prices drove operating — lower operating rates from the MTO sector, which led to a more balanced market in China. Towards the end of the quarter, we’ve seen various improvements in methanol supply and inventories globally, although markets remain quite tight, and, as I already noted, there remains considerable MTO demand available to restart. We are seeing methanol pricing around $290 per ton in China and we continue to see premiums above these levels in all regional markets. We estimate the marginal cost of production based on coal pricing in China to be around $270 per ton to $280 per ton. Looking ahead to the third quarter, we expect to see continued tight methanol markets.

We’re seeing healthy demand growth across all traditional and energy related downstream sectors, with MTO operating rates influenced by the availability of supply. We anticipate this increasing demand will be met by increased operating rates in the industry, as well as new supply from G3, which will be partially offset by our supply reduction in Trinidad in September when we shut down Atlas and restart Titan. Additionally, the 1.8 million ton plant in Malaysia has announced it will be starting in 2024. As always, we continue to monitor the macroeconomic environment and its impact on global methanol demand. Now, turning to our production, Methanex production in the second quarter was lower compared to the first quarter due to gas constraints in Chile, Egypt, and New Zealand.

In Chile, we’re currently in the period of lower gas supplies available from Argentina, so we’re operating one plant at less than full capacity. We continue to make progress on gas availability from Chile and Argentina. And based on production year-to-date, a successful turnaround at Chile IV that will improve efficiency on restart and progress we’ve made securing gas from Argentina for the non-winter period this year, we expect 2024 production will be slightly above the high end of our guidance of 1.2 million tons. In Egypt, the plant produced at high rates after the syngas compressor maintenance completed in mid-February. In early June, the plant was temporarily idle when significantly increased seasonal demand for power generation due to elevated temperatures in the country led to various measures by the government to manage gas balances, including curtailments to industrial plants.

The plant restarted at reduced operating rates shortly thereafter and has operated at fluctuating rates based on gas availability with current operating rates at approximately 80%. We’ve seen some stabilization of gas balances in the country, but we expect to see some continued limitations on supply, as we progress through the third quarter. In New Zealand, we operated one plant through the second quarter due to both lower-than-expected gas deliveries from upstream suppliers as well as from the redirection of some of our contractual gas for use in the broader energy sector. The country’s overall energy balances are currently very tight, with demand seasonally high during the Southern Hemisphere winter combined with low hydro levels and relatively lower gas supply in 2024 compared with previous years.

As a result, we believe some of our contractual gas has been redirected to the electricity and other domestic energy markets. We’re in continuing discussions with our gas suppliers to ensure our contractual entitlements are being respected, as well as engaging with our gas suppliers and government agencies in supporting efforts to improve energy balances in the country. Based on our production year-to-date and current gas deliveries, we expect 2024 production will be below the low end of our previous guidance of 1 million tons. Now, turning to our current financial position and outlook. We ended the first quarter with approximately $390 million of cash. With the G3 plant now in the process of startup, the project is now complete. The total final capital cost is slightly less than $1.3 billion, excluding fixed costs related to the delay, and we do not currently have any further growth capital commitments.

Our primary focus for capital for the remainder of 2024 is to repay rather than refinance the $300 million bond due in December. Turning to the third quarter. Our European quarterly price was posted at EUR535 per metric ton, a EUR10 per ton increase. Our North America, Asia Pacific, and China prices for August were posted at $695, $400, and $380 per ton, respectively. We estimate that based on these posted prices, our July and August average realized price range is between approximately $350 and $360 per metric ton. We expect adjusted EBITDA for the third quarter will be lower than the second quarter, due primarily to lower produced sales from Chile and New Zealand and G3’s initial inventory build post startup. We expect sales of produced products and earnings for the fourth quarter of 2024 to be more representative of the run rate of our company with G3 at full production.

We’d now be happy to answer questions.

Q&A Session

Follow Methanex Corp (NASDAQ:MEOH)

Operator: [Operator Instructions] Our first question comes from the line of Ben Isaacson with Scotiabank. Your line is live.

Ben Isaacson: Thank you very much, and good morning, everyone. Two questions for me. First one is on New Zealand. New Zealand seems to be disappointing on a fairly consistent basis. Does it make sense to indefinitely idle one of the two Motunui plants? I mean, there are several benefits for this, the risk profile of your portfolio of assets improves; you have reduced variability of free cash flow, which may result in a higher multiple; you take out a little bit of capacity from the market. Can you just comment on that? Thank you.

Rich Sumner: Thanks, Ben. Yeah. So, right now, we’re working through a lot of, I’d say, two big issues right now. One is, as you say, I think that the gas from the upstream, the investments that are being made in existing fields, both new wells as well as investing to enhance performance of existing wells, I think we’ve seen gas deliveries lower than expectations. I think, we also are working through the short term dynamics in the industry, where we believe some of our gas that would be coming to us may not be. And that’s — so that’s something we’re also working through. But certainly, right now, I think you should be thinking about, in the foreseeable months here, a one plant operation, and over the next few months, we’ll be assessing what our views are for the rest of the year and considering how we should be operating those assets. So, I think, there’ll be more to come as we assess the rest of the year here.

Ben Isaacson: Thank you for that. And my follow up question is on the Entropy deal, which is really quite interesting, but it’s also a little bit scary because there’s the potential for others to do this as well. So, can you run through what are the constraints for — that’s preventing everyone else from kind of copying what you’ve done and adding another 5% to 10% of supply? That would be helpful. And actually, if you could actually maybe give a number in terms of how much capacity is there that can be — that could also do this? Thank you.

Rich Sumner: Yeah. Maybe I’ll just give a bit of background on that project. I think, first and foremost, we’re happy to be working with Entropy, which is a technology provider who already has this technology in place in gas processing plant in Alberta with sequestration. I think when you think about the framework you need to make this work, you have to think about jurisdictions that, one, are going to have a regulatory and supportive regulatory framework. They also have to have sequestration available. And so, it’s not — I wouldn’t say it’s just easy to replicate, but we’re excited to be exploring this opportunity in the Pre-FEED stage here. Just to give you a sense. It’ll capture about 400 metric tons of CO2 per day. About two-thirds of that would be used in our production, and the remaining third would be sequestered in underground caverns close to our plant.

That’s all being worked on, the infrastructure on making this commercial. And so we’re excited to do it. I think this debottlenecking will add, like we said, around 50,000 tons of low carbon methanol. And so, yeah, we’ll work through everything in this Pre-FEED stage and trying to get to a point of decision making sometime in middle of 2025.

Ben Isaacson: Thank you very much.

Operator: Thank you for your question. Our next question comes from the line of Mike Leithead with Barclays Capital. Your line is live.

Mike Leithead: Great. Thanks. Good morning, guys. First question just on G3. Congrats on successfully starting that up. What is your current expectation…

Rich Sumner: Thank you.

Mike Leithead: For when that should be sort of fully running, fully utilized, fully flowing then through the P&L, and you guys are getting commensurate earnings? And then if we just kind of use where we are roughly today in terms of methanol and gas, just what’s your sort of latest best estimate of the annualized EBITDA we should expect from this plant?

Rich Sumner: So I guess the wrap — I’ll start with the ramp-up period. We expect — as we disclosed, look, we’ll be ramping up to full rates in the coming weeks. As of today, the plants operating at 70% operating rates, which is how we start up a plant, and then we steadily increase over time. There could be points in time where you’re testing all the different elements of the plant, and you may take it down for a period to bring it back up. But as of right now, we’re at 70% operating rates and we’ll be there for a period to increase — steadily increase in the coming weeks here. So the wrap up is relatively — we plan it to be relatively quick. In terms of how it will actually impact earnings, I think that it’s safe to say we don’t expect a lot of G3 coming through in the third quarter, but we would expect that to be a fairly — sometime around the end of this quarter and the beginning of next quarter.

So inventory flows are not all that easy to track through our system. But I would say, it’s — we’ve guided that 2020 — the fourth quarter should look something like a run rate with G3. In terms of the run rate EBITDA from G3, we’ve guided that at $350 a ton, which we think we’re slightly above that, that it generates around $200 million to $250 million in EBITDA per year, depending on gas between $3 and $4 in MMBTU. So hopefully that answers your questions there.

Mike Leithead: Yep. That’s super helpful. And then just a couple of quick follow ups on the Entropy announcement. First, is that correct in hearing that if everything goes to plan, you should expect to make FID by mid-2025? Can you just speak to how dependent this project going forward is on receiving government funding? And then, just briefly, is this sort of a one-off opportunity just because of the plan and location, or if this goes well, this is something you could seek to replicate at some of your other plants as well?

Rich Sumner: Yep. So I’ll start with this — the initial phase and the timelines here. So, this is a phase — this is actually — this project is part of an initial, a two-step phase project. The first phase is a unit that would capture 400 metric tons per day. About two-thirds of that would be used in our production, and about a-third would be sequestered underground. So that when you think about value, what we will be paying? We’ll be paying for that CO2 value in methanol production for two-thirds of it, and another third will be — will need to get carbon credits for sequestering CO2. And there’s obviously a regime of carbon taxing and carbon credits in Canada that we will be — that will support this project. In addition to that, there’s other incentive programs, provincially and federally, that this will look to access, and we think that it will be eligible for, all of those things we’ll be looking at through the Pre-FEED stage.

The Phase 2 of the project is actually to really scale this such that you would triple the size of it and you would capture all of our Scope 1 emissions and sequester all of the — effectively all of the CO2 from the Scope 1 of the plant. That will take more work, more infrastructure that would be required, and a lot more certainty around the carbon framework that would support, and carbon pricing framework that would support that second phase investment. So, hopefully, that helps answer your question.

Mike Leithead: Great. Thank you.

Operator: Thank you for your questions. Our next question comes from the line of Josh Spector with UBS. Your line is live.

James Cannon: Hey, guys, this is James Cannon on for Josh. I just wanted to — I just wanted to poke on what’s going on with the discount rate. It seems like while it’s crept up over time this year, it’s been a lot higher so far. I think based on your comments on third quarter to date, it seems like we’re relatively stable with the last quarter’s levels. But kind of looking beyond that, how should we think through the rest of the year and kind of into next?

Rich Sumner: Well, I think, when we look at our price — when we look at our pricing, we’ve been guiding — for the second quarter, we guided to around $345 per ton to $350 per ton. I think we averaged $352 per ton for the quarter. For this coming quarter, we’re guiding to $350 per ton to $360 per ton. And when I look at where pricing is, we’ve got cost curve levels at $290 per ton to $300 per ton in China. So, I think, when we look at it, we’re setting price as to what a reasonable market price should be in all the regions we’re selling into. And we’re achieving significant premiums, I think, which is reflective of tight market balances, which we expect to continue for the rest of the year, as I said in the earlier remarks. So, we’re not as focused on the discount, we’re focused on realizations. And I do think you’ve seen discounts creeping up mainly because that’s the competitive way pricing into the market, not what we think is reflective of lower realizations.

James Cannon: Okay. Got it. And then, I think, through the quarter, we — I saw some reports on curtailments to Trinidad gas. I think you called out a couple of unplanned outages. I was wondering were those related and can you comment on how you’re seeing that develop through this quarter?

Rich Sumner: Yeah. So those were not gas related. Our outages was — we had our air separation unit went down in Trinidad and we had to perform some maintenance in Trinidad. But there was gas outages in the upstream during the quarter. Didn’t affect our operations, but it did affect other producers at the Point Lisas Estate. So — but yeah, unrelated is — for our Atlas operations.

James Cannon: Okay. Thank you.

Operator: Thanks for your questions. Our next question comes from the line of Joel Jackson with BMO Capital Markets. Your line is live.

Joel Jackson: Hi, Rich. I’m going to ask three quick questions if you allow me. First, on your maintained guidance for 7 million tons of Methanex produced volume, how round is that 7 million tons? Is it more like 6.5 million tons to 7 million tons. And the reason I say is to make all your numbers work, it’s kind of hard. You say Q3, production will be a little bit lower than Q2. To get that 7 million tons for the full year, you need to run rate, I don’t know, like a 10 million ton run rate in the fourth quarter. That’d be everything going full out. Can you maybe talk about how round the 7 million ton number is?

Rich Sumner: I think we feel good about the 7 million ton with G3 where it is right now and our expectation for G3. I’ve talked about some ups and downs as it relates to Chile and New Zealand, and I think most of the other things are factored in. So we feel pretty good at the 7 million ton range for the quarter — or for the year, sorry.

Joel Jackson: For the year. Got you. And then second question — second question on the Egypt repair that you had, you obviously put back online seven months ago, you’ve got some insurance settlement maybe coming from that. Can you talk about that? And that’s obviously not including your EBITDA forecast, but I imagine that would be put into EBITDA one of these quarters coming up?

Rich Sumner: Yeah. We expect to collect on insurance in the coming quarter. So, I think, that’s going to — we should expect to see insurance proceeds coming in in Q3.

Joel Jackson: But that’s not included in your guidance in the outlook last night?

Rich Sumner: No, that’s not included in the guidance.

Joel Jackson: And finally, I mean, now that you’re just — you’ve got G3 starting up the last day or two, probably ramped up over the next month or so, got the maturing debt later in the fourth quarter, what is the signpost now to be confident to buyback stock? When are you ready to go again on the buyback?

Rich Sumner: I mean, right now, our first priority is to the debt and we still have some cash to build in advance of that. So, that’s our main focus today. I think, once we move past that, we don’t have any major growth capital. I think, we can start looking at use of capital beyond that. We have said that there would be — we’ve got a very strong free cash flow profile, as you know, and there will be room for considering share repurchases along with we do think there’s some room for the debt, but we think we can do things in a balanced way there post building up for our $300 million debt repayment. So, I think, what we want to do is focus on that today. And then once we get confident we’re there, we can consider other uses of capital beyond.

Joel Jackson: Thank you.

Operator: Our next question comes from the line of Steve Hansen with Raymond James. Your line is live.

Steve Hansen: Yeah. Good morning, guys. Thanks for the time. I wanted to follow up on Joel’s question indirectly about the buyback. I think in the past you said that $200 million to $250 million of cash is sort of like a comfortable position you’d like to keep on the balance sheet at any given time just to operate the business methodically. I mean, has that changed at all with G3 production coming online? Do you need slightly more than that? Just trying to get a sense for that comfort position so we can think about the excess cash build and how that might go to other uses?

Rich Sumner: I think we would be in the range of $250 million to $300 million. Just when we look at where our cash is earned and how we need to move it around to run the business, that’s sort of our comfort level. So I wouldn’t think that there’s a meaningful change with G3 and not having the capital spend there. But, yeah, that’s sort of a range to be using, Steve.

Steve Hansen: Okay. That’s helpful. And then just jumping over to Chile, you’ve obviously been successful at procuring some additional gas there. You’ve talked about increased availability there before, but it’s taken some time to ultimately execute on getting the gas. Is anything changed in the market down there that’s allowed you greater comfort to secure more gas? Or what are we seeing down there?

Rich Sumner: Well, I’m very comfortable around securing gas outside of the winter period, right. We’ve got a lot of gas available to us from Argentina outside the winter period. In fact, more than our needs. I think, we’re being offered more than we need for our Chilean operations, which is very positive. The challenge will be through the winter period, because gas is restricted from an export perspective. We are in early discussions there about the winter period, because the country is increasingly trying to ramp up pipeline connections and gas takeaway capability out of the Vaca Muerta. They’re also developing fields in the South, which is going to add in another 5 million cubic meters into the grid. That’s effectively stranded. And so, we’re a very logical purchaser for that gas. So, I think, these things are going to develop, but our goal is to have year round gas in Chile, given the dynamics in Argentina.

Steve Hansen: Okay. That’s helpful. And then just one final one, if I may, is going back to Ben’s question at the very outset and some of the challenges in New Zealand. I mean, is there inability to move any one of those plants over time? You’ve done it in the past. Those are older facilities of course. But is there any context around whether a move of facility might make some sense in terms of optimization of the footprint?

Rich Sumner: Yeah. Well, I guess, the first thing is maybe just the relocation economics and how they work. Relocation economics aren’t significant savings over — on capital. And so, it’s — usually if you’re looking at that, it’s more trying to execute a project to grow methanol supply in a shorter timeframe. And that’s where you get value. I don’t think we’re in that position today. These plants are not — I don’t think would be the plants you would look to move. And I don’t think we’re in a position today to be making that decision or being exploring that based on our gas outlook at this point. We want to — we need to get a better feel for the medium long term in the country before we’d be looking at anything like that.

Steve Hansen: Okay. Very good. Appreciate the help.

Operator: Thanks for your questions. Our next question comes from the line of Hassan Ahmed with Alembic Global. Your line is live.

Hassan Ahmed: Good morning, Rich.

Rich Sumner: Good morning.

Hassan Ahmed: Just wanted to revisit a bunch of questions that were asked earlier about New Zealand. I mean, obviously you guys have gas contracts in place over there. I’m just trying to get a sort of — if you could dig a bit deeper into the structure of those contracts, I mean, is there any restitution, could you receive any payments maybe for the gas deliveries that did not happen?

Rich Sumner: So, I think, maybe I’ll start with the contracts themselves. These contracts — we are — we have entitlement to gas per year, but that is based off of what they are bringing to market, right. And there is priority in terms of gas. And so if the gas is available and our contracts should be fulfilled, yes, there’s restitution that should be paid. And that’s certainly when we say we’re in discussions with our gas suppliers, these are some of the discussions that are being had. Now, if the gas is not available and their portfolio is not delivering, that’s another issue. We don’t have deliver or pay obligations on those gas contracts if the gas is not — is not producing. So, I think, there’s two issues there, and we’re dealing with both of them right now.

Hassan Ahmed: Very helpful. And as a follow up, on the demand side of things, in sort of the press release, you guys talked about global methanol demand being up sequentially. Just wanted to get a better sense of what the inventory situation looks like, is demand improving, maybe potentially because of a restock? And part and parcel with that, what are you guys seeing above and beyond just the MTO side in terms of Chinese demand? And maybe if you could, on the China side, also parlay that with if you are possibly seeing any maybe shutdowns in Chinese capacity as well?

Rich Sumner: Yeah. I will. Thanks, Hassan. In terms of overall demand, maybe I’ll just give a snapshot of the market globally and look to last year and where we are this year. Last year, we would say the market was probably around 92 million tons. And that does include a slow start in China. But today for the first half of 2024, we’re probably in the 95 million tons to 96 million tons. And that’s with MTO flat or slightly lower than last year. So when we think about demand growth, it’s actually been — it’s been pretty strong and healthy around the different sectors compared to last year. I think, when we look around the markets outside of China, growth rates are about 3% over last year. And then when we’re looking in China, we’re seeing growth rates for traditional demand at about 4% to 5% over last year.

And then the energy related demand that’s in China, which is quite meaningful, is also at that around 4% rates over last year. So, I think, that’s actually really putting stress on the methanol markets and the ability to meet that demand with supply. And that’s where the MTO sector, I think, is really becoming that balance. When we think about China demand, the domestic economy is still something we watch really closely. And domestic consumption, which we don’t think is strong, export markets have been stronger this year, which is — has helped bring that demand up. In terms of operating rates in China, we’re seeing operating rates in China above 60%. So that’s actually reasonably high relative to past performance there. So, we don’t think there’s a lot of latent capacity that can come on in China to meet this growing demand.

So that’s — our view is that we are in a tight market. Inventories are reflective of that. There could be swings between when MTO shuts down and when it starts up. But we would say we’re in a pretty structurally tight market right now with inventories pretty tight.

Hassan Ahmed: Very helpful, Rich. Thank you so much.

Rich Sumner: Thanks.

Operator: Thank you for your question. Our next question comes from the line of Nelson Ng With RBC Capital Markets. Your line is live.

Nelson Ng: Great. Thanks, and good morning, everyone. First question is on Trinidad in terms of Titan restarting and mothballing Atlas. Now that you’re kind of heading up to that point, should we expect any kind of one-time costs to impact EBITDA in Q3? And then also, is the gas contract, the current one that’s expiring, does it expire, like, in early September or at the end of September?

Rich Sumner: Okay. So, yeah, the — in terms of cost, you shouldn’t expect any cost. And we are planning this to be quite a seamless transition from Atlas to Titan. So we are not expecting a lot of downtime or periods where we’re not producing at all in Trinidad. And then when it relates to gas contracts, you can think mid-September timeframe for the change over there.

Nelson Ng: Okay. And then just to clarify, on the Atlas asset, are there any — like, do you expect any, like, write-downs or is there any debt still at Atlas that needs to be repaid over the coming months?

Rich Sumner: No debt. And when we think about the asset values there, we look at Trinidad as a group, and that’s something we always review. I don’t think we’re going to point towards any asset write-downs at this time, and — but we do look at it. These assets are — they are older assets, so we don’t have a ton of book value associated with them, and — but that’s something we’ll look at as we look at our accounts each year.

Nelson Ng: Great, thanks. And then my next question relates to the Entropy development. So, I guess, big picture, you’re not investing that much capital. So, I think, your partner is going to be investing most of the CapEx or it’ll be coming from grants. So from your perspective, like, from a cost perspective, is it mostly the — like, are you paying for the operating cost and the CO2 feedstock that you’ll be using? So is it somewhat neutral from a — like, from a cost per metric ton of methanol production, or is it going to cost you more, because you’re producing lower or less carbon intensive methanol? Can you just talk about the economics, assuming that Pre-FEED and FEED and all that gives you the green light to move forward with the project?

Rich Sumner: Yeah. Thanks. So, the commercial arrangements aren’t finalized. That’s one thing I want to start with, where part of the Pre-FEED will also be looking at what the commercial structures should look like. And so, I think, when we — what we — in our initial press release, we said Entropy would own — construct and own the unit. Obviously, they are the technology provider and the experts on this technology, but we’re looking at the commercial arrangements as part of the Pre-FEED process. But when you think about the economics, you’re right. Like, they — as I said, two-thirds of the economics will come from what we pay for the economics of producing methanol to produce incremental tons. And then the remainder will come through sequestration, the value of carbon credits for storing CO2 underground.

So you can think of the methanol generating two-thirds of the value and the carbon credits generating one-third of the value. And as it relates to those pricing, we’re looking at what it takes to make this project work. And in addition, I think, what regulatory support is available that will help push this forward as well. So — and all of that, we’re looking through the Pre-FEED process.

Nelson Ng: Okay. So, I guess, very big picture for it to work from Methanex’s perspective given that you’re mainly kind of paying for the CO2 is — do you want to be kind of cost neutral, but generate lower carbon intensive methanol? Is that your — like, is that the benefit you’re looking for? Or…

Rich Sumner: I think maybe your question is a little bit, are we expecting to generate a Blue Premium or something that allows us to market this above cost? I don’t think that the Blue — if that’s the question, I don’t think the Blue — there’s a Blue Methanol market today that we’re expecting is going to support this project. That market really is undeveloped. And so what we need is the value of this methanol from a conventional methanol to work and to make sense in terms of generating additional earnings or EBITDA from that methanol production.

Nelson Ng: I see. That makes sense. I’ll leave it there. Thank you.

Operator: Thank you for your questions. Our next question is from the line of Matthew Blair with TPH. Your line is live.

Matthew Blair: Thank you. Good morning, Rich. Could you give us a sense on exactly how much inventory you’re the looking to build in the third quarter, or any sort of metrics like days inventory that you’re targeting with G3 online?

Rich Sumner: Yeah. I think, first and foremost, like, I think a lot of the inventory will be managed through our sales levels. And we don’t expect that our sales levels change dramatically with G3. What we will see is a mix of inventory. We’ll have more produced product and less purchased product in our system. So, we’re not targeting a change in inventory to support G3. I do think what we should expect to see is that this is lower cost inventory that we’ll be holding versus buying product on the market. So there could be some positives on our working capital that we can look forward to on that.

Matthew Blair: Sounds good. And then the G3 delay costs were $25 million in the first quarter, down to $13 million in the second quarter. Should we pencil in anything for the third quarter?

Rich Sumner: Nope. Well, yeah, sorry. One month of G3 delay cost for July. And that will be, kind of, you could take our number in the second quarter, divide by three.

Matthew Blair: Great. Thank you.

Operator: Our next question is from the line of Laurence Alexander with Jefferies. Your line is live.

Laurence Alexander: Good morning. Could you give a quick update on sort of how quickly the marine demand should be flowing through in the next couple of years? I mean, we see kind of the longer term build rate, but just how much of an impact we should be thinking of for next year? And how much of — how are those companies discussing with you sort of relying on supply given, sort of, how tight the market looks to be getting?

Rich Sumner: Yeah. Thanks, Laurence. So on the marine demand, maybe I’ll talk to where we are today and then how that will kind of develop over time. Right now, we talked about last year being the first year where methanol ships outpaced LNG in terms of the order book. Right now, we’re expecting that order book is well over 300 ships on the water in the 2028, 2029 timeframe. And I think what we’re doing is talking about demand potential, because it’s difficult to say exactly what the demand would be. And when we quote demand potential, we’re not saying this is what the total demand will be, but the demand potential will start off next year probably. The total demand potential is somewhere close to 10 million tons now. There will be 1.5 million tons or so next year, and then you build up to 3.5 million tons, and then you’re up to 7 million tons, and then you work your way into the 10 million tons of demand potential.

Now the big question is, what will they actually burn? Because these are dual fuel vessels. And to your point, we’re having a lot of discussions with the shipping companies about supply. And, I think, a lot of those discussions start with low carbon or green methanol, because that — the intent here is a lot of these ships are looking to methanol from a decarbonization perspective. I think, they’re seeing that, one, there’s not a lot of availability, and, two, that the cost is really high to begin with. So, we are also — we are in discussions as well about conventional methanol. I think securing supply is going to be critical, and that’s what our low carbon solutions team is working on with the shipping company. So it’s really hard for us to kind of give you precise numbers until we work through — starting to see secure securing some contracts and working with the shipping industry more as they make their decisions on these future fuel choices they’re going to make.

So we hope to be able to give you more insight as this develops, because we are getting closer to the timeframes where these ships are in the water.

Laurence Alexander: Thank you.

Operator: Thank you for your question. [Operator Instructions] We have a question from Charles Neivert with Piper Sandler. Your line is live.

Charles Neivert: Good morning, guys. You talked about MTO being sort of the tipping or balancing point for the industry. Can you talk a little bit about where the price of methanol needs to be to sort of push it out or take it back in? I mean, we’re sort of balancing on the line, maybe now can we go higher and still keep the MTO plants in? Or — and this is all assuming that the ethylene and polyethylene markets stay approximately where they are. But under that circumstance, where are we on that pricing?

Rich Sumner: Yeah. I’ll start with the pricing. We’re at very low pricing. Low, like historically low. So it’s hard to see it getting worse. We’ve had ethylene propylene prices in Asia be between $800 per ton and $900 per ton for quite some time. And that — just in a historical basis, that would be correlated to about a $40 oil price environment. And so we think that there really is a low — at the very low cycle right now. That translates into a C2, C3 kind of straight affordability at around where the cost curve is today. So, call it that $280 level. These guys have integrated. There are a lot of them are integrated downstream. So when you look at integration and the full value chain, there’s usually more value when you go further down.

And so it’s higher than that. But, I think, when we start moving into pricing from ethanol, kind of, getting above the $320 to $350 range, we start to see some pressure on their operations. And today pricing is in and around that $290 level and it’s holding. And we’ve seen one MTO unit large scale just recently start up. So, I think, we’re kind of in this where cost curve and MTO affordability is in this $280 to $320 kind of level. And we’ve seen that be quite stable in China around that. If there’s an improvement in ethylene and propylene markets, you would expect that the ability to pay goes up. And increasingly, this is a demand driven industry right now. And so we think that that would further support pricing.

Charles Neivert: Great. Thanks very much.

Operator: Thank you for your question. And ladies and gentlemen, there are no further questions at this time. And I’ll now turn the call back over to Mr. Rich Sumner.

Rich Sumner: Great. Well, thank you for your questions and interest in our company. We hope you’ll join us in November when we update you on our third quarter results.

Operator: Thank you. And this does conclude today’s conference call. You may now disconnect. Have a great day.

Follow Methanex Corp (NASDAQ:MEOH)